Finishing Kit

  
    
< Lifting the fuselage, so the gear legs can go on

First gear leg on >

< I made a "drift" from a standard hardware bolt (one end tapered and the wrench end cut off)

Main wheels and gear on >

( First landing ? )

< Nose wheel and gear mounted.

I knew I was saving that 70 lbs bag of sand for something >

< Back in the "factory"

Adjusting the canopy frame>

< Rear bow on the canopy had to be bent down

Heating the shop, in order to trim the canopy edge>

Page 1]  [ Page 2 ]  [ Page 3 ]  [ Page 4 ]  [ Page 5 ]  [ Page 6 ] [ Page 7 ]

[ Home Page ]   [ Empennage ]   [ Wings ]  [ Panel/Interior ]  [ Fuselage Kit ]  [ FWF ]  [ Misc ]