Fuselage |
| < Added proseal between the floor and firewall bulkhead.
Floor and mid-cabin panels riveted on > |
||
| < Sub-floor structure riveted together.
Attaching the sub-floor, before taking the airframe out of the jig> |
||
| < The two sides panel left to rivet.
I installed sound proofing material to the inside of the cooling ramp > |
||
| < Cooling ramp installed.
Off the Jig ! > |
||
| < The canoe
Ready to start work on the inside of the fuselage. > |
![]() |
[ Fuselage - Page 1 ] [ Fuselage - Page 2 ] [ Fuselage - Page 3] [ Fuselage - Page 4 ] [ Fuselage - Page 5 ] [ Fuselage - Page 6 ]
[ Fuselage - Page 7 ] [ Fuselage - Page 8 ] [Fuselage - Page 9][Fuselage - Page 10 ] [ Fuselage - Page 11]