Fuselage

   
 
< Added proseal between the floor and firewall bulkhead.

Floor and mid-cabin panels riveted on >

< Sub-floor structure riveted together.

Attaching the sub-floor, before taking the airframe out of the jig>

< The two sides panel left to rivet.

I installed sound proofing material to the inside of the cooling ramp >

< Cooling ramp installed.

Off the Jig ! >

< The canoe

Ready to start work on the inside of the fuselage. >

 

Fuselage - Page 1 ]  [ Fuselage  - Page 2 ] [ Fuselage - Page 3] [ Fuselage - Page 4 ] [ Fuselage - Page 5 ] [ Fuselage - Page 6 ]

        [ Fuselage - Page 7 ] [ Fuselage - Page 8 ] [Fuselage - Page 9][Fuselage - Page 10 ] [ Fuselage - Page 11]

[ Home Page ]   [ Empennage ]  [ Wing Kit ] [ FWF ] [ Panel/Interior ]  [ Finishing Kit ]   [ Misc ]